Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK3005321 Federal Type : C
Water System Name : NOWATA CO RWD #7 State Type : C
Principal County Served : NOWATA Primary Source : SWP
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 11-01-2009 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 2 RT QT 02-01-2024 to 02-28-2024 05-01-2024 to 05-31-2024
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 20 RT 6M 01-01-2024 to 06-30-2024 07-01-2024 to 12-31-2024
Total Number of Schedules Displayed = 2

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
CONDUCT REQUIRED MONITORING 2016-03-09
HAND DELIVER/MAIL/POST PUBLIC NOTICE 2016-03-23
SUBMIT REQUIRED SAMPLES 2016-12-21
SUBMIT PLAN 2017-01-05
ELIMINATE AND PREVENT VIOLATIONS 2017-01-05
SUBMIT RESPONSE TO NOV 2017-01-05
HAND DELIVER/MAIL/POST PUBLIC NOTICE 2017-01-05
SUBMIT PROOF OF PN TO DEQ 2017-01-15
SUBMIT OEL REPORT TTHM 2020-12-29 12-29-2020
SUBMIT OEL REPORT TTHM 2020-12-29 12-29-2020
SUBMIT OEL REPORT TTHM 2020-12-29 12-29-2020
SUBMIT OEL REPORT TTHM 2020-12-29 12-29-2020
SUBMIT OEL REPORT TTHM 2021-12-29 12-29-2021
SUBMIT OEL REPORT TTHM 2021-12-29 12-29-2021
ELIMINATE AND PREVENT VIOLATIONS 2022-04-23
SUBMIT OEL REPORT HAA5 2022-12-29 12-29-2022
SUBMIT OEL REPORT TTHM 2022-12-29 12-29-2022
SUBMIT OEL REPORT TTHM 2022-12-29 12-29-2022
SUBMIT OEL REPORT HAA5 2022-12-29 12-29-2022
SUBMIT OEL REPORT TTHM 2023-03-31 03-31-2023
SUBMIT OEL REPORT TTHM 2023-03-31 03-31-2023
SUBMIT OEL REPORT TTHM 2023-06-29 06-29-2023
SUBMIT OEL REPORT TTHM 2023-06-29 06-29-2023
SUBMIT CCR CERTIFICATION 2023-10-01
PAY FINE 2023-11-17
SUBMIT CORRECTIVE ACTION PLAN 2023-12-01
ATTAIN COMPLIANCE 2024-11-01
MAINTAIN COMPLIANCE 2025-11-01
CERTIFIED MAIL RECEIVED 03-26-2022
SUBMIT ENGINEERING REPORT
CERTIFIED MAIL RECEIVED 05-01-2023
Total Number of Compliance Schedules Displayed = 31

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Mar 29 06:45:17 CDT 2024