Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK2001409 Federal Type : C
Water System Name : LEXINGTON State Type : C
Principal County Served : CLEVELAND Primary Source : GW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 07-01-2023 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 1 RT YR 09-01-2024 to 09-30-2024 09-01-2025 to 09-30-2025
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y Monitoring Partially Completed 06-01-2024 to 09-30-2026
TP001 TREATMENT PLANT IOC INORGANIC CHEMICALS 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT RAD1 RADIONUCLIDES (NEW) 1 RT 6Y 01-01-2020 to 12-31-2025 01-01-2026 to 12-31-2031
TP001 TREATMENT PLANT SOCR SOC (REGULATED) 1 RT 3Y 01-01-2024 to 12-31-2025 01-01-2026 to 12-31-2028
TP001 TREATMENT PLANT SOCR SOC (REGULATED) 1 RT YR No Monitoring in Current Period No Monitoring After 12-31-2023
TP001 TREATMENT PLANT VOCN VOC (CORRECTED) 1 RT QT Monitoring Completed 07-01-2024 to 09-30-2024
Total Number of Schedules Displayed = 7

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 1094 ASBESTOS 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 TREATMENT PLANT 1005 ARSENIC 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
TP001 TREATMENT PLANT 1052 SODIUM 1 RT 3Y initialized initialized
Total Number of Schedules Displayed = 4

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
NOTIFY WHOLESALER + COLIFORM DS SAMPLE 2023-05-11 05-11-2023
ELIMINATE AND PREVENT VIOLATIONS 2023-07-08
SUBMIT CCR CERTIFICATION 2024-07-01
Total Number of Compliance Schedules Displayed = 3

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Tue Apr 23 11:29:43 CDT 2024