Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK2001302 Federal Type : C
Water System Name : KEYES UTILITY AUTH. State Type : C
Principal County Served : CIMARRON Primary Source : GW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 12-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 1 RT 3Y 08-01-2023 to 08-30-2025 08-01-2026 to 08-30-2028
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 6M 01-01-2024 to 06-30-2024 07-01-2024 to 12-31-2024
POE01 WELLS (3) IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2034 to 12-31-2034
POE01 WELLS (3) RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
POE01 WELLS (3) VOCN VOC (CORRECTED) 1 RT 6Y 01-01-2020 to 12-31-2025 01-01-2031 to 12-31-2031
Total Number of Schedules Displayed = 5

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
POE01 WELLS (3) 2105 2,4-D 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 WELLS (3) 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
POE01 WELLS (3) 2050 ATRAZINE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 WELLS (3) 2010 BHC-GAMMA 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 WELLS (3) 2034 GLYPHOSATE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 WELLS (3) 1038 NITRATE-NITRITE 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
POE01 WELLS (3) 1052 SODIUM 1 RT 3Y initialized initialized
POE01 WELLS (3) 2020 TOXAPHENE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
Total Number of Schedules Displayed = 8

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT RESPONSE TO NOV 2023-09-28
SUBMIT CORRECTIVE ACTION PLAN 2023-09-28
SUBMIT CCR CERTIFICATION 2024-07-01
Total Number of Compliance Schedules Displayed = 3

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Apr 19 03:30:06 CDT 2024