Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK2001207 Federal Type : C
Water System Name : FORT TOWSON State Type : C
Principal County Served : CHOCTAW Primary Source : GU
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 12-01-2009 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 0999 CHLORINE 31 6 01-01-2010 SERD
TP001 TREATMENT PLANT 0100 TURBIDITY 31 1 12-31-2006 MAXT
TP001 TREATMENT PLANT 0100 TURBIDITY 31 1 12-31-2006 95PT
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 10-01-2006 SDRD
Total Number of Schedules Displayed = 4

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 1 RT YR 11-01-2024 to 11-30-2024 11-01-2025 to 11-30-2025
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y 06-01-2022 to 09-30-2024 06-01-2025 to 09-30-2027
TP001 TREATMENT PLANT IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT RAD1 RADIONUCLIDES (NEW) 1 RT 3Y Monitoring Partially Completed 01-01-2026 to 12-31-2028
TP001 TREATMENT PLANT SOCR SOC (REGULATED) 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 TREATMENT PLANT VOCN VOC (CORRECTED) 1 RT 6Y Monitoring Completed 01-01-2029 to 12-31-2034
Total Number of Schedules Displayed = 6

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TP001 TREATMENT PLANT 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
TP001 TREATMENT PLANT 1052 SODIUM 1 RT YR initialized initialized
Total Number of Schedules Displayed = 3

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT CORRECTIVE ACTION PLAN 2023-07-01
MAINTAIN COMPLIANCE 2024-07-01
OBTAIN PROPERLY CERTIFIED OPERATOR 2024-07-01
SUBMIT ENGINEERING REPORT 2025-01-01
Total Number of Compliance Schedules Displayed = 4

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Apr 19 16:53:20 CDT 2024