Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK1021529 Federal Type : C
Water System Name : WAGONER CO. RWD #4 State Type : C
Principal County Served : WAGONER Primary Source : SW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
30 RT MN 05-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT NORTH 0100 TURBIDITY 31 6 07-01-2019 MAXT
TP001 TREATMENT PLANT NORTH 0999 CHLORINE 31 6 07-01-2019 SERD
TP002 TREATMENT PLANT SOUTH 0999 CHLORINE 31 6 07-01-2019 SERD
TP002 TREATMENT PLANT SOUTH 0100 TURBIDITY 31 6 07-01-2019 MAXT
TP002 TREATMENT PLANT SOUTH 0100 TURBIDITY 31 6 07-01-2019 95PT
TP001 TREATMENT PLANT NORTH 0100 TURBIDITY 31 6 07-01-2019 95PT
Total Number of Schedules Displayed = 6

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 4 RT QT 05-01-2024 to 05-31-2024 08-01-2024 to 08-31-2024
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 30 RT 3Y 06-01-2022 to 09-30-2024 06-01-2025 to 09-30-2027
TP001 TREATMENT PLANT NORTH IOC INORGANIC CHEMICALS 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT NORTH RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Completed 01-01-2026 to 12-31-2031
TP001 TREATMENT PLANT NORTH VOCN VOC (CORRECTED) 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP002 TREATMENT PLANT SOUTH IOC INORGANIC CHEMICALS 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
TP002 TREATMENT PLANT SOUTH RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Completed 01-01-2026 to 12-31-2031
TP002 TREATMENT PLANT SOUTH VOCN VOC (CORRECTED) 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
Total Number of Schedules Displayed = 8

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TOCRAW TOC RAW 1927 ALKALINITY, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TOCRAW TOC RAW 2920 CARBON, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TP001 TREATMENT PLANT NORTH 1005 ARSENIC 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT NORTH 2920 CARBON, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TP001 TREATMENT PLANT NORTH 2034 GLYPHOSATE 2 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 TREATMENT PLANT NORTH 1038 NITRATE-NITRITE 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 TREATMENT PLANT NORTH 2036 OXAMYL 2 RT YR No Monitoring in Current Period No Monitoring Required
TP001 TREATMENT PLANT NORTH 1052 SODIUM 1 RT YR initialized initialized
TP002 TREATMENT PLANT SOUTH 1005 ARSENIC 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
TP002 TREATMENT PLANT SOUTH 2920 CARBON, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TP002 TREATMENT PLANT SOUTH 2034 GLYPHOSATE 2 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP002 TREATMENT PLANT SOUTH 1038 NITRATE-NITRITE 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP002 TREATMENT PLANT SOUTH 2036 OXAMYL 2 RT YR No Monitoring in Current Period No Monitoring Required
TP002 TREATMENT PLANT SOUTH 1052 SODIUM 1 RT YR initialized initialized
Total Number of Schedules Displayed = 14

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SANITARY DEFECT RTCR 2019-11-28 11-28-2019
SUBMIT CCR CERTIFICATION 2024-07-01
COMPLETE CONSTRUCTION 2025-09-01
ATTAIN COMPLIANCE 2026-10-01
MAINTAIN COMPLIANCE 2027-10-01
CERTIFIED MAIL RECEIVED 03-22-2023
SUBMIT ENGINEERING REPORT
Total Number of Compliance Schedules Displayed = 7

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Apr 19 04:16:26 CDT 2024