Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK1020301 Federal Type : C
Water System Name : HASKELL CO. WATER COMPANY State Type : C
Principal County Served : HASKELL Primary Source : SW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RT MN 05-01-2001 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 HASKELL CO WATER CO WTP 0999 CHLORINE 31 4 07-01-2008 SERD
TP001 HASKELL CO WATER CO WTP 0100 TURBIDITY 31 6 01-01-2005 95PT
TP001 HASKELL CO WATER CO WTP 0100 TURBIDITY 31 6 01-01-2005 MAXT
TP001 HASKELL CO WATER CO WTP 0999 CHLORINE 31 4 06-30-1993 EPRD
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 01-01-1990 STDS
Total Number of Schedules Displayed = 5

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 2 RT QT 01-01-2024 to 01-31-2024 04-01-2024 to 04-30-2024
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y 06-01-2022 to 09-30-2024 06-01-2025 to 09-30-2027
TP001 HASKELL CO WATER CO WTP IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2033 to 12-31-2033
TP001 HASKELL CO WATER CO WTP RAD1 RADIONUCLIDES (NEW) 1 RT 9Y Monitoring Partially Completed 01-01-2026 to 12-31-2034
TP001 HASKELL CO WATER CO WTP VOCN VOC (CORRECTED) 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2026
Total Number of Schedules Displayed = 5

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TOCRAW TOC RAW 1927 ALKALINITY, TOTAL 1 RT MN 03-01-2024 to 03-31-2024 04-01-2024 to 04-30-2024
TOCRAW TOC RAW 2920 CARBON, TOTAL 1 RT MN 03-01-2024 to 03-31-2024 04-01-2024 to 04-30-2024
TP001 HASKELL CO WATER CO WTP 2105 2,4-D 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 HASKELL CO WATER CO WTP 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
TP001 HASKELL CO WATER CO WTP 2010 BHC-GAMMA 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 HASKELL CO WATER CO WTP 2920 CARBON, TOTAL 1 RT MN 03-01-2024 to 03-31-2024 04-01-2024 to 04-30-2024
TP001 HASKELL CO WATER CO WTP 2032 DIQUAT 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 HASKELL CO WATER CO WTP 2034 GLYPHOSATE 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 HASKELL CO WATER CO WTP 2015 METHOXYCHLOR 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 HASKELL CO WATER CO WTP 1038 NITRATE-NITRITE 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 HASKELL CO WATER CO WTP 1052 SODIUM 1 RT YR initialized initialized
TP001 HASKELL CO WATER CO WTP 1052 SODIUM 1 RT 9Y initialized No Monitoring After 09-30-2023
Total Number of Schedules Displayed = 12

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT RESPONSE TO NOV 2024-03-01
CERTIFIED MAIL RECEIVED 2024-03-08 02-16-2024
ELIMINATE AND PREVENT VIOLATIONS 2024-03-22
ELIMINATE AND PREVENT VIOLATIONS 2024-03-29
CERTIFIED MAIL RECEIVED 2024-04-24
SUBMIT RESPONSE TO NOV 2024-05-01
CERTIFIED MAIL RECEIVED 03-18-2024
CERTIFIED MAIL RECEIVED 03-11-2024
Total Number of Compliance Schedules Displayed = 8

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Thu Mar 28 19:56:55 CDT 2024