Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK1010828 Federal Type : C
Water System Name : CLINTON State Type : C
Principal County Served : CUSTER Primary Source : SW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RP DL 10-26-2023 11-09-2023 10/26 11/9 3100 COLIFORM (TCR)
3 RP DL 10-26-2023 11-09-2023 10/26 11/9 3100 COLIFORM (TCR)
10 RT MN 02-01-2002 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 3

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 CLINTON WTP 0100 TURBIDITY 31 6 01-01-2016 MAXT
TP001 CLINTON WTP 0100 TURBIDITY 31 6 01-01-2015 95PT
TP001 CLINTON WTP 0999 CHLORINE 31 6 07-01-2008 SERD
TP001 CLINTON WTP 1009 CHLORITE 31 1 04-01-2005 CLO3
TP001 CLINTON WTP 1008 CHLORINE DIOXIDE 31 1 04-01-2005 CLO2
TP001 CLINTON WTP 0999 CHLORINE 31 24 06-30-1993 EPRD
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 01-01-1990 STDS
Total Number of Schedules Displayed = 7

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 2 RT QT 05-01-2024 to 05-31-2024 08-01-2024 to 08-31-2024
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 20 RT YR 06-01-2024 to 09-30-2024 06-01-2025 to 09-30-2025
POE02 CLINTON WTP AND CANUTE WELLS IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
POE02 CLINTON WTP AND CANUTE WELLS RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
POE02 CLINTON WTP AND CANUTE WELLS VOCN VOC (CORRECTED) 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
TP002 GROUNDWATER TREATMENT PLANT IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP002 GROUNDWATER TREATMENT PLANT RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
TP002 GROUNDWATER TREATMENT PLANT VOCN VOC (CORRECTED) 1 RT QT 04-01-2024 to 06-30-2024 07-01-2024 to 09-30-2024
Total Number of Schedules Displayed = 8

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 1009 CHLORITE 3 RT QT 04-01-2024 to 06-30-2024 07-01-2024 to 09-30-2024
DS001 DISTRIBUTION SYSTEM 3014 E. COLI 4 TG 1T 10-25-2023 to 11-08-2023 One Time Monitoring
POE02 CLINTON WTP AND CANUTE WELLS 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE02 CLINTON WTP AND CANUTE WELLS 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
POE02 CLINTON WTP AND CANUTE WELLS 1052 SODIUM 1 RT YR initialized initialized
POE02 CLINTON WTP AND CANUTE WELLS 1052 SODIUM 1 RT 3Y initialized No Monitoring After 12-12-2023
TOCRAW TOC RAW 1927 ALKALINITY, TOTAL 1 RT MN Monitoring Completed 05-01-2024 to 05-31-2024
TOCRAW TOC RAW 2920 CARBON, TOTAL 1 RT MN Monitoring Completed 05-01-2024 to 05-31-2024
TP001 CLINTON WTP 2920 CARBON, TOTAL 1 RT MN Monitoring Completed 05-01-2024 to 05-31-2024
TP002 GROUNDWATER TREATMENT PLANT 1005 ARSENIC 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP002 GROUNDWATER TREATMENT PLANT 2034 GLYPHOSATE 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
TP002 GROUNDWATER TREATMENT PLANT 1038 NITRATE-NITRITE 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP002 GROUNDWATER TREATMENT PLANT 1052 SODIUM 1 RT YR initialized initialized
TP002 GROUNDWATER TREATMENT PLANT 1052 SODIUM 1 RT 3Y initialized No Monitoring After 12-12-2023
Total Number of Schedules Displayed = 14

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
NOTIFY WHOLESALER + COLIFORM DS SAMPLE 2017-11-16 11-16-2017
NOTIFY WHOLESALER + COLIFORM DS SAMPLE 2018-08-03 08-03-2018
ELIMINATE AND PREVENT VIOLATIONS 2023-10-13
SUBMIT CORRECTIVE ACTION PLAN 2023-10-13
NOTIFY WHOLESALER + COLIFORM DS SAMPLE 2023-10-26 10-26-2023
LVL1 TTT MULTIPLE TC+ 2023-11-24 11-24-2023
ELIMINATE AND PREVENT VIOLATIONS 2023-12-27
ELIMINATE AND PREVENT VIOLATIONS 2024-02-22
SUBMIT CCR CERTIFICATION 2024-07-01
CERTIFIED MAIL RECEIVED 12-15-2023
CERTIFIED MAIL RECEIVED 02-12-2024
Total Number of Compliance Schedules Displayed = 11

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Apr 19 06:16:59 CDT 2024