Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK1010401 Federal Type : C
Water System Name : ATOKA State Type : C
Principal County Served : ATOKA Primary Source : SW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RT MN 03-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP002 ATOKA WTP NEW 0100 TURBIDITY 31 6 07-01-2018 95PT
DS001 DISTRIBUTION SYSTEM 1009 CHLORITE 31 1 12-01-2009
TP002 ATOKA WTP NEW 1008 CHLORINE DIOXIDE 31 1 12-01-2009 CLO2
DS001 DISTRIBUTION SYSTEM 1008 CHLORINE DIOXIDE 31 1 12-01-2009
TP002 ATOKA WTP NEW 1009 CHLORITE 31 1 12-01-2009 CLO3
TP002 ATOKA WTP NEW 0999 CHLORINE 31 24 06-30-2005 EPRD
TP002 ATOKA WTP NEW 0100 TURBIDITY 31 6 02-01-2005 MAXT
TP002 ATOKA WTP NEW 0999 CHLORINE 31 4 06-30-1993 SERD
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 01-01-1990 STDS
Total Number of Schedules Displayed = 9

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 2 RT QT 04-01-2024 to 04-30-2024 07-01-2024 to 07-31-2024
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y 06-01-2024 to 09-30-2026 06-01-2027 to 09-30-2029
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 20 RT 6M No Monitoring in Current Period No Monitoring After 12-31-2023
TP002 ATOKA WTP NEW IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
TP002 ATOKA WTP NEW RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
TP002 ATOKA WTP NEW VOCN VOC (CORRECTED) 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
Total Number of Schedules Displayed = 6

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 1094 ASBESTOS 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
DS001 DISTRIBUTION SYSTEM 1009 CHLORITE 3 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TOCRAW TOC RAW 1927 ALKALINITY, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TOCRAW TOC RAW 2920 CARBON, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TP002 ATOKA WTP NEW 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
TP002 ATOKA WTP NEW 2920 CARBON, TOTAL 1 RT MN 04-01-2024 to 04-30-2024 05-01-2024 to 05-31-2024
TP002 ATOKA WTP NEW 2032 DIQUAT 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
TP002 ATOKA WTP NEW 2034 GLYPHOSATE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
TP002 ATOKA WTP NEW 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
TP002 ATOKA WTP NEW 1052 SODIUM 1 RT YR initialized initialized
Total Number of Schedules Displayed = 10

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
ATTAIN COMPLIANCE 2024-07-01
SUBMIT CCR CERTIFICATION 2024-07-01
MAINTAIN COMPLIANCE 2025-07-01
SUBMIT ENGINEERING REPORT 2026-07-01
Total Number of Compliance Schedules Displayed = 4

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Apr 26 00:18:49 CDT 2024