Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK1021778 Federal Type : C
Water System Name : CANOE MOUNTAIN WATER SYSTEM State Type : C
Principal County Served : CHEROKEE Primary Source : SW
Status : A Activity Date : 03-20-2023

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 03-01-2023 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 05-01-2025 SDRD
TP001 TREATMENT PLANT 0100 TURBIDITY 31 1 05-01-2025 MAXT
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 03-21-2023 04-30-2025 SDRD
TP001 TREATMENT PLANT 0100 TURBIDITY 31 1 03-21-2023 95PT
TP001 TREATMENT PLANT 0100 TURBIDITY 31 1 03-21-2023 04-30-2025 MAXT
TP001 TREATMENT PLANT 0999 CHLORINE 31 1 03-21-2023 SERD
Total Number of Schedules Displayed = 6

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 1 RT QT 08-01-2025 to 08-31-2025 11-01-2025 to 11-30-2025
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 5 RT 6M 07-01-2025 to 12-31-2025 -----
TP001 TREATMENT PLANT IOC INORGANIC CHEMICALS 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP001 TREATMENT PLANT RAD1 RADIONUCLIDES (NEW) 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
TP001 TREATMENT PLANT SOCR SOC (REGULATED) 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
TP001 TREATMENT PLANT VOCN VOC (CORRECTED) 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
Total Number of Schedules Displayed = 6

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TP001 TREATMENT PLANT 1005 ARSENIC 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP001 TREATMENT PLANT 1024 CYANIDE 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP001 TREATMENT PLANT 1038 NITRATE-NITRITE 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
TP001 TREATMENT PLANT 1041 NITRITE 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP001 TREATMENT PLANT 1052 SODIUM 1 RT YR initialized initialized
Total Number of Schedules Displayed = 5

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
ELIMINATE AND PREVENT VIOLATIONS 2023-05-12
PROVIDE DISINFECTION 2023-05-12
SUBMIT SAFE BACTERIOLOGICAL SAMPLES 2023-05-12
SUBMIT RESPONSE TO NOV 2023-06-27
ELIMINATE AND PREVENT VIOLATIONS 2023-06-27
IMPLEMENT REQUIRED CORRECTIVE ACTION 2023-08-12
ELIMINATE AND PREVENT VIOLATIONS 2024-01-19
ELIMINATE AND PREVENT VIOLATIONS 2024-05-18
LEAD SERCIVE LINE INVEN RECEIVED 2024-10-16
COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
SUBMIT LEAD SERVICE LINE INVENTORY 2024-10-16 10-16-2024
CERTIFIED MAIL RECEIVED 01-13-2024
Total Number of Compliance Schedules Displayed = 12

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jul 07 06:53:34 CDT 2025