Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK4001138 Federal Type : NTNC
Water System Name : THREE SPRINGS FARM State Type : NTNC
Principal County Served : CHEROKEE Primary Source : SWP
Status : A Activity Date : 03-14-2005

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 02-01-2020 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 1 RT QT 09-01-2025 to 09-30-2025 12-01-2025 to 12-31-2025
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 5 RT YR Monitoring Completed 06-01-2026 to 09-30-2026
POE01 COMBINED POE 1 IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
POE01 COMBINED POE 1 VOCN VOC (CORRECTED) 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
POE02 COMBINED POE 2 IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
POE02 COMBINED POE 2 VOCN VOC (CORRECTED) 1 RT 6Y No Monitoring in Current Period 01-01-2026 to 12-31-2031
POE02 COMBINED POE 2 VOCN VOC (CORRECTED) 1 RT 6Y Monitoring Completed No Monitoring After 12-31-2025
POE03 COMBINED POE 3 IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
POE03 COMBINED POE 3 VOCN VOC (CORRECTED) 1 RT 6Y No Monitoring in Current Period 01-01-2026 to 12-31-2031
POE03 COMBINED POE 3 VOCN VOC (CORRECTED) 1 RT 6Y Monitoring Completed No Monitoring After 12-31-2025
Total Number of Schedules Displayed = 10

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
POE01 COMBINED POE 1 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 COMBINED POE 1 1025 FLUORIDE 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
POE01 COMBINED POE 1 2034 GLYPHOSATE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
POE01 COMBINED POE 1 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
POE01 COMBINED POE 1 1052 SODIUM 1 RT YR initialized initialized
POE02 COMBINED POE 2 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE02 COMBINED POE 2 1025 FLUORIDE 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
POE02 COMBINED POE 2 2034 GLYPHOSATE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
POE02 COMBINED POE 2 1038 NITRATE-NITRITE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
POE02 COMBINED POE 2 1052 SODIUM 1 RT YR initialized initialized
POE03 COMBINED POE 3 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE03 COMBINED POE 3 1025 FLUORIDE 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
POE03 COMBINED POE 3 2034 GLYPHOSATE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
POE03 COMBINED POE 3 1038 NITRATE-NITRITE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
POE03 COMBINED POE 3 1052 SODIUM 1 RT YR initialized initialized
Total Number of Schedules Displayed = 15

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
Total Number of Compliance Schedules Displayed = 0

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Thu Jul 03 19:13:34 CDT 2025