Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK4002654 Federal Type : C
Water System Name : EASTSIDE MHP State Type : C
Principal County Served : GRADY Primary Source : GW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 10-01-2019 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 5 RT 6M 01-01-2025 to 06-30-2025 07-01-2025 to 12-31-2025
WL001 SW WELL (WELL #1) IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL001 SW WELL (WELL #1) RAD1 RADIONUCLIDES (NEW) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL001 SW WELL (WELL #1) SOCR SOC (REGULATED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL001 SW WELL (WELL #1) VOCN VOC (CORRECTED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL003 NW WELL (WELL #3) IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL003 NW WELL (WELL #3) RAD1 RADIONUCLIDES (NEW) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL003 NW WELL (WELL #3) SOCR SOC (REGULATED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL003 NW WELL (WELL #3) VOCN VOC (CORRECTED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL004 NORTH CENTRAL WELL (WELL #4) IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL004 NORTH CENTRAL WELL (WELL #4) RAD1 RADIONUCLIDES (NEW) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL004 NORTH CENTRAL WELL (WELL #4) SOCR SOC (REGULATED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL004 NORTH CENTRAL WELL (WELL #4) VOCN VOC (CORRECTED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL005 NE WELL (WELL #5) IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL005 NE WELL (WELL #5) RAD1 RADIONUCLIDES (NEW) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL005 NE WELL (WELL #5) SOCR SOC (REGULATED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL005 NE WELL (WELL #5) VOCN VOC (CORRECTED) 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
Total Number of Schedules Displayed = 17

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
WL001 SW WELL (WELL #1) 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL001 SW WELL (WELL #1) 1024 CYANIDE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL001 SW WELL (WELL #1) 1038 NITRATE-NITRITE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
WL001 SW WELL (WELL #1) 1041 NITRITE 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL001 SW WELL (WELL #1) 1052 SODIUM 1 RT 3Y initialized initialized
WL003 NW WELL (WELL #3) 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL003 NW WELL (WELL #3) 1024 CYANIDE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL003 NW WELL (WELL #3) 1038 NITRATE-NITRITE 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL003 NW WELL (WELL #3) 1041 NITRITE 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL003 NW WELL (WELL #3) 1052 SODIUM 1 RT 3Y initialized initialized
WL004 NORTH CENTRAL WELL (WELL #4) 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL004 NORTH CENTRAL WELL (WELL #4) 1024 CYANIDE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL004 NORTH CENTRAL WELL (WELL #4) 1038 NITRATE-NITRITE 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL004 NORTH CENTRAL WELL (WELL #4) 1041 NITRITE 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL004 NORTH CENTRAL WELL (WELL #4) 1052 SODIUM 1 RT 3Y initialized initialized
WL005 NE WELL (WELL #5) 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL005 NE WELL (WELL #5) 1024 CYANIDE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
WL005 NE WELL (WELL #5) 1038 NITRATE-NITRITE 1 RT QT 04-01-2025 to 06-30-2025 07-01-2025 to 09-30-2025
WL005 NE WELL (WELL #5) 1041 NITRITE 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
WL005 NE WELL (WELL #5) 1052 SODIUM 1 RT 3Y initialized initialized
Total Number of Schedules Displayed = 20

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT SAFE BACTERIOLOGICAL SAMPLES 2022-03-26
ELIMINATE AND PREVENT VIOLATIONS 2022-03-26
PROVIDE DISINFECTION 2022-03-28
IMPLEMENT REQUIRED CORRECTIVE ACTION 2022-06-26
PAY FINE 2023-09-17
OBTAIN PROPERLY CERTIFIED OPERATOR 2023-10-01
HIRE AN ENGINEER 2023-10-01
SUBMIT CCR CERTIFICATION 2023-10-01
ELIMINATE AND PREVENT VIOLATIONS 2023-11-17
SUBMIT ENGINEERING REPORT 2024-01-01
ELIMINATE AND PREVENT VIOLATIONS 2024-04-18
SUBMIT CCR CERTIFICATION 2024-07-01
ELIMINATE AND PREVENT VIOLATIONS 2024-08-08
ELIMINATE AND PREVENT VIOLATIONS 2024-08-22
LEAD SERCIVE LINE INVEN RECEIVED 2024-10-16
COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
SUBMIT LEAD SERVICE LINE INVENTORY 2024-10-16 10-16-2024
SUBMIT CCR CERTIFICATION 2025-07-01
CERTIFIED MAIL RECEIVED
PROVIDE BOTTLED WATER
CERTIFIED MAIL RECEIVED 07-29-2024
CERTIFIED MAIL RECEIVED 03-01-2022
Total Number of Compliance Schedules Displayed = 22

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Tue May 13 07:36:22 CDT 2025