Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK2007101 Federal Type : C
Water System Name : TIPTON State Type : C
Principal County Served : TILLMAN Primary Source : SWP
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 11-01-2013 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 2 RT QT 08-01-2025 to 08-31-2025 11-01-2025 to 11-30-2025
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y 06-01-2025 to 09-30-2027 06-01-2028 to 09-30-2030
POE01 BLENDING STATION IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2032 to 12-31-2032
POE01 BLENDING STATION RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
POE01 BLENDING STATION VOCN VOC (CORRECTED) 1 RT 6Y Monitoring Completed 01-01-2027 to 12-31-2027
Total Number of Schedules Displayed = 5

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
POE01 BLENDING STATION 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
POE01 BLENDING STATION 2050 ATRAZINE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 BLENDING STATION 1024 CYANIDE 1 RT 9Y Monitoring Completed 01-01-2032 to 12-31-2032
POE01 BLENDING STATION 2032 DIQUAT 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
POE01 BLENDING STATION 2033 ENDOTHALL 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 BLENDING STATION 2005 ENDRIN 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 BLENDING STATION 2034 GLYPHOSATE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 BLENDING STATION 2015 METHOXYCHLOR 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
POE01 BLENDING STATION 2595 METRIBUZIN 1 RT 3Y initialized No Monitoring After 03-28-2025
POE01 BLENDING STATION 1038 NITRATE-NITRITE 1 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
POE01 BLENDING STATION 1041 NITRITE 1 RT 3Y Monitoring Completed 01-01-2027 to 12-31-2027
POE01 BLENDING STATION 1052 SODIUM 1 RT YR initialized initialized
POE01 BLENDING STATION 2020 TOXAPHENE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
Total Number of Schedules Displayed = 13

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT OEL REPORT TTHM 2023-06-29 06-29-2023
SUBMIT OEL REPORT TTHM 2023-06-29 06-29-2023
SUBMIT OEL REPORT TTHM 2023-06-29 06-29-2023
SUBMIT OEL REPORT TTHM 2023-06-29 06-29-2023
SUBMIT OEL REPORT TTHM 2023-09-28 09-28-2023
SUBMIT OEL REPORT TTHM 2023-09-28 09-28-2023
SUBMIT OEL REPORT TTHM 2023-12-29 12-29-2023
SUBMIT OEL REPORT TTHM 2023-12-29 12-29-2023
SUBMIT OEL REPORT TTHM 2023-12-29 12-29-2023
SUBMIT OEL REPORT TTHM 2023-12-29 12-29-2023
SUBMIT OEL REPORT TTHM 2024-03-30 03-30-2024
SUBMIT OEL REPORT TTHM 2024-03-30 03-30-2024
SUBMIT OEL REPORT TTHM 2024-03-30 03-30-2024
SUBMIT OEL REPORT TTHM 2024-03-30 03-30-2024
SUBMIT LEAD SERVICE LINE INVENTORY 2024-10-16 10-16-2024
COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
LEAD SERCIVE LINE INVEN RECEIVED 2024-10-16
ATTAIN COMPLIANCE 2024-12-01
SUBMIT CCR CERTIFICATION 2025-07-01
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
MAINTAIN COMPLIANCE 2025-12-01
SUBMIT ENGINEERING REPORT 2026-12-01
PROVIDE BOTTLED WATER
Total Number of Compliance Schedules Displayed = 26

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Jul 13 19:14:05 CDT 2025