Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK2002146 Federal Type : C
Water System Name : HICKORY MEADOWS State Type : C
Principal County Served : DELAWARE Primary Source : GW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 02-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 1 RT 3Y Monitoring Completed 09-01-2026 to 09-30-2028
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 6M 01-01-2026 to 06-30-2026 07-01-2026 to 12-31-2026
POE01 WELL NO. 1 IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2033 to 12-31-2033
POE01 WELL NO. 1 RAD1 RADIONUCLIDES (NEW) 1 RT 6Y 01-01-2026 to 12-31-2031 01-01-2032 to 12-31-2037
POE01 WELL NO. 1 VOCN VOC (CORRECTED) 1 RT 6Y 01-01-2026 to 12-31-2031 01-01-2032 to 12-31-2032
Total Number of Schedules Displayed = 5

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
POE01 WELL NO. 1 2105 2,4-D 1 RT QT Monitoring Completed 04-01-2026 to 06-30-2026
POE01 WELL NO. 1 1005 ARSENIC 1 RT 3Y 01-01-2030 to 12-31-2030 01-01-2033 to 12-31-2033
POE01 WELL NO. 1 2034 GLYPHOSATE 1 RT QT Monitoring Completed 04-01-2026 to 06-30-2026
POE01 WELL NO. 1 1038 NITRATE-NITRITE 1 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
POE01 WELL NO. 1 1052 SODIUM 1 RT 3Y initialized initialized
Total Number of Schedules Displayed = 5

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT MORS 2018-03-30
SUBMIT PROOF OR CERTIFIC OF PN TO DEQ 2018-03-30
SUBMIT PLAN 2018-04-04
LVL1 TTT TC+/EC- WO RPTS 2024-10-03 10-03-2024
SUBMIT LEAD SERVICE LINE INVENTORY 2024-10-16 10-16-2024
COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
SUBMIT CCR CERTIFICATION 2025-07-01
Total Number of Compliance Schedules Displayed = 7

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sat Mar 07 01:42:06 CST 2026