Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK2000602 Federal Type : C
Water System Name : WATONGA State Type : C
Principal County Served : BLAINE Primary Source : GW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RT MN 09-01-2023 1/1 12/31 3100 COLIFORM (TCR)
3 RP DL 05-29-2026 06-12-2026 5/29 6/12 3100 COLIFORM (TCR)
3 RP DL 05-29-2026 06-12-2026 5/29 6/12 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 3

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 20 RT 3Y 06-01-2025 to 09-30-2027 06-01-2028 to 09-30-2030
POE07 WELLS 7,10,13,14,15,16&17 IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2034 to 12-31-2034
POE07 WELLS 7,10,13,14,15,16&17 RAD1 RADIONUCLIDES (NEW) 1 RT 6Y 01-01-2026 to 12-31-2031 01-01-2032 to 12-31-2037
POE07 WELLS 7,10,13,14,15,16&17 VOCN VOC (CORRECTED) 1 RT 6Y 01-01-2026 to 12-31-2031 01-01-2032 to 12-31-2037
TP001 TREATMENT PLANT IOC INORGANIC CHEMICALS 1 RT 9Y 10-01-2026 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT RAD1 RADIONUCLIDES (NEW) 1 RT 6Y 01-01-2026 to 12-31-2031 01-01-2032 to 12-31-2037
TP001 TREATMENT PLANT VOCN VOC (CORRECTED) 1 RT 6Y 01-01-2026 to 12-31-2031 01-01-2032 to 12-31-2037
Total Number of Schedules Displayed = 7

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 3014 E. COLI 10 TG 1T 05-28-2026 to 06-11-2026 One Time Monitoring
DS001 DISTRIBUTION SYSTEM 3014 E. COLI 10 TG 1T 05-28-2026 to 06-11-2026 One Time Monitoring
POE03 WELLS 3,5,6&12 1038 NITRATE-NITRITE 1 RT QT No Monitoring in Current Period ----
POE07 WELLS 7,10,13,14,15,16&17 2931 1,2-DIBROMO-3-CHLOROPROPANE 2 RT YR Monitoring Completed 01-01-2027 to 12-31-2027
POE07 WELLS 7,10,13,14,15,16&17 2105 2,4-D 2 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
POE07 WELLS 7,10,13,14,15,16&17 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
POE07 WELLS 7,10,13,14,15,16&17 2050 ATRAZINE 2 RT YR Monitoring Completed 01-01-2027 to 12-31-2027
POE07 WELLS 7,10,13,14,15,16&17 1024 CYANIDE 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
POE07 WELLS 7,10,13,14,15,16&17 2034 GLYPHOSATE 2 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
POE07 WELLS 7,10,13,14,15,16&17 1038 NITRATE-NITRITE 1 RT QT 10-01-2026 to 12-31-2026 01-01-2027 to 03-31-2027
POE07 WELLS 7,10,13,14,15,16&17 1041 NITRITE 1 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
POE07 WELLS 7,10,13,14,15,16&17 2037 SIMAZINE 2 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
POE07 WELLS 7,10,13,14,15,16&17 1052 SODIUM 1 RT 3Y initialized initialized
TP001 TREATMENT PLANT 2931 1,2-DIBROMO-3-CHLOROPROPANE 2 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP001 TREATMENT PLANT 2105 2,4-D 2 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP001 TREATMENT PLANT 1005 ARSENIC 1 RT 9Y 10-01-2026 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT 2050 ATRAZINE 2 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP001 TREATMENT PLANT 1024 CYANIDE 1 RT 9Y 10-01-2026 to 12-31-2028 01-01-2029 to 12-31-2037
TP001 TREATMENT PLANT 2034 GLYPHOSATE 2 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP001 TREATMENT PLANT 1038 NITRATE-NITRITE 1 RT QT 10-01-2026 to 12-31-2026 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1041 NITRITE 1 RT 3Y 01-01-2026 to 12-31-2028 01-01-2029 to 12-31-2031
TP001 TREATMENT PLANT 1052 SODIUM 1 RT 3Y initialized initialized
Total Number of Schedules Displayed = 22

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
LVL1 TTT MULTIPLE TC+ 2022-11-04 11-04-2022
SUBMIT PROOF OF PN TO DEQ 2023-01-01
LVL1 TTT MULTIPLE TC+ 2024-11-15 11-15-2024
CERTIFY LEAD SL NOTIFICATION 2025-07-01
LVL1 TTT MULTIPLE TC+ 2026-06-27 06-27-2026
CERTIFY LEAD SL NOTIFICATION 2026-07-01 07-01-2026
MAINTAIN COMPLIANCE 2027-01-01
SUBMIT ENGINEERING REPORT 04-15-2021
CERTIFIED MAIL RECEIVED 01-30-2023
PROVIDE BOTTLED WATER 04-15-2021
Total Number of Compliance Schedules Displayed = 10

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Oct 25 01:28:52 CDT 2026