Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : OK1011503 Federal Type : C
Water System Name : SNYDER PUBLIC WORKS AUTHORITY State Type : C
Principal County Served : KIOWA Primary Source : SW
Status : A Activity Date : 02-02-1902

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 05-01-2001 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 SNYDER WTP 0100 TURBIDITY 31 6 05-01-2025 MAXT
TP001 SNYDER WTP 0999 CHLORINE 31 3 05-01-2025 SERD
TP001 SNYDER WTP 1008 CHLORINE DIOXIDE 31 1 05-01-2025 CLO2
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 05-01-2025 SDRD
TP001 SNYDER WTP 0999 CHLORINE 31 3 07-01-2008 04-30-2025 SERD
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 10-01-2006 04-30-2025 SDRD
TP001 SNYDER WTP 0100 TURBIDITY 31 6 01-01-2005 04-30-2025 MAXT
TP001 SNYDER WTP 0100 TURBIDITY 31 6 01-01-2005 95PT
TP001 SNYDER WTP 1009 CHLORITE 31 1 01-01-2004 CLO3
TP001 SNYDER WTP 1008 CHLORINE DIOXIDE 31 1 01-01-2004 04-30-2025 CLO2
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 2 01-01-1990 STDS
Total Number of Schedules Displayed = 11

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
CL001 CL2 STATION SOUTH WELL IOC INORGANIC CHEMICALS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
CL001 CL2 STATION SOUTH WELL RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
CL001 CL2 STATION SOUTH WELL VOCN VOC (CORRECTED) 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
DS001 DISTRIBUTION SYSTEM DBP2 DBP STAGE 2 2 RT QT 07-01-2025 to 07-31-2025 10-01-2025 to 10-31-2025
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y 06-01-2023 to 09-30-2025 06-01-2026 to 09-30-2028
TP001 SNYDER WTP IOC INORGANIC CHEMICALS 1 RT 9Y Monitoring Completed 01-01-2033 to 12-31-2033
TP001 SNYDER WTP RAD1 RADIONUCLIDES (NEW) 1 RT 6Y Monitoring Partially Completed 01-01-2026 to 12-31-2031
TP001 SNYDER WTP VOCN VOC (CORRECTED) 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
Total Number of Schedules Displayed = 8

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
CL001 CL2 STATION SOUTH WELL 2105 2,4-D 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
CL001 CL2 STATION SOUTH WELL 1005 ARSENIC 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
CL001 CL2 STATION SOUTH WELL 2034 GLYPHOSATE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
CL001 CL2 STATION SOUTH WELL 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
CL001 CL2 STATION SOUTH WELL 1052 SODIUM 1 RT YR initialized initialized
DS001 DISTRIBUTION SYSTEM 1009 CHLORITE 3 RT QT 07-01-2025 to 09-30-2025 10-01-2025 to 12-31-2025
TOCRAW TOC RAW 1927 ALKALINITY, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TOCRAW TOC RAW 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TP001 SNYDER WTP 1005 ARSENIC 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
TP001 SNYDER WTP 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TP001 SNYDER WTP 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2026 to 12-31-2026
TP001 SNYDER WTP 1052 SODIUM 1 RT YR initialized initialized
Total Number of Schedules Displayed = 12

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
ATTAIN COMPLIANCE 2024-10-01
SUBMIT OEL REPORT TTHM 2025-06-29 06-29-2025
SUBMIT OEL REPORT TTHM 2025-06-29 06-29-2025
SUBMIT OEL REPORT TTHM 2025-06-29 06-29-2025
SUBMIT OEL REPORT HAA5 2025-06-29 06-29-2025
SUBMIT OEL REPORT TTHM 2025-06-29 06-29-2025
SUBMIT OEL REPORT HAA5 2025-06-29 06-29-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
SUBMIT OEL REPORT TTHM 2025-09-28 09-28-2025
MAINTAIN COMPLIANCE 2025-10-01
SUBMIT ENGINEERING REPORT
CERTIFIED MAIL RECEIVED 11-21-2022
Total Number of Compliance Schedules Displayed = 14

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jul 07 06:48:49 CDT 2025